top of page

Chislehurst House

Scaffold consists of, 4 elevations of scaffold which is fully boarded with full ladder access.

Debris netting fitted to all sides, monarflex sheeting from  roof to the eaves level.

Full temporary roof cover,

Haki staircase to all lift levels.

Hoist Tower inclosure for a 500k hoist with gates fitted at ground level and top boarded lift level.

Single storey scaffold to garage and work shop building, to change roof.

The scaffold was built to design

  • LinkedIn
  • Facebook
  • Instagram

©2020 MASONBELL By Elmwood Site Services

bottom of page